References
[1] Solimanpur, M., Vrat, P., & Shankar, R. A heuristic to minimize makespan of cell scheduling problem. International journal of production economics, Vol.88, No.3, pp.231-241, 2004.
[2] Li, Y., Li, X., & Gupta, J. N. Solving the multi-objective flowline manufacturing cell scheduling problem by hybrid harmony search. Expert Systems with Applications, Vol.42, No.3, pp.1409-1417, 2015.
[3] Knosala, R., & Wal, T. A production scheduling problem using genetic algorithm. Journal of Materials Processing Technology, Vol. 109, No. 1-2, pp.90-95, 2001.
[4] Engin, O., & Döyen, A. A new approach to solve hybrid flow shop scheduling problems by artificial immune system. Future generation computer systems, Vol. 20, No.6, pp.1083-1095, 2004.
[5] Yang, Y., Chen, Y., & Long, C. Flexible robotic manufacturing cell scheduling problem with multiple robots. International Journal of Production Research, Vol.54, No.22, pp.6768-6781, 2016.
[6] Zeng, C., Tang, J., & Yan, C. Job-shop cell-scheduling problem with inter-cell moves and automated guided vehicles. Journal of Intelligent Manufacturing, Vol.26, No.5, pp.845-859, 2015.
[7] Ghalehgolabi, M., & Rezaeipanah, A. Intrusion Detection System Using Genetic Algorithm and Data Mining Techniques Based on the Reduction. International Journal of Computer Applications Technology and Research, Vol.6, No.11, pp.461-466, 2017.
[8] Rezaeipanah, A., Matoori, S. S., & Ahmadi, G. A hybrid algorithm for the university course timetabling problem using the improved parallel genetic algorithm and local search. Applied Intelligence, pp.1-26, 2020.
[9] Rezaeipanah, A., Nazari, H., & Abdollahi, M. Reducing Energy Consumption in Wireless Sensor Networks Using a Routing Protocol Based on Multi-level Clustering and Genetic Algorithm, International Journal of Wireless and Microwave Technologies(IJWMT), Vol.3, No.1, pp.1-16, 2020.
[10] Johnson, S. M. Optimal two?and three?stage production schedules with setup times included. Naval research logistics quarterly, Vol.1, No.1, pp.61-68, 1954.
[11] Opitz, H. Influence of Vibrations on Tool Life and Surface Condition in Milling Operation. International Institution of Production Engineering Research, 1954.
[12] Lopez, L., Carter, M. W., & Gendreau, M. The hot strip mill production scheduling problem: A tabu search approach. European Journal of Operational Research,Vol.106, No.2-3, pp.317-335, 1998.
[13] Erenay, B., Suer, G. A., Huang, J., & Maddisetty, S. Comparison of layered cellular manufacturing system design approaches. Computers & Industrial Engineering, Vol.85, pp.346-358, 2015.
[14] Yazhi, L., Xiaoping, L. & Jatinder, N. G. Solving the multi-objective flowline manufacturing cell scheduling problem by hybrid harmony search. Expert Systems with Applications, Vol.42, No.3, pp.1409-1417, 2015.
[15] Kia, R., Kazemi, M., Gol, S. S., Tavakkoli-Moghaddam, R., & Khorrami, J. A mathematical model for assessing the effects of a lot splitting feature on a dynamic cellular manufacturing system. Production Engineering, pp. 1-17, 2017.
[16] Jadaan, O. A., Rajamani, L., & Rao, C. R. Non-dominated ranked genetic algorithm for solving constrained multi-objective optimization problems. Journal of Theoretical & Applied Information Technology, Vol.5, No.5, 2009.
[17] Ahmadi, E., Zandieh, M., Farrokh, M., & Emami, S. M. A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms. Computers & Operations Research, Vol.73, pp.56-66, 2016.
[18] Zitzler, E., Laumanns, M., & Thiele, L. Improving the strength Pareto evolutionary algorithm. Technical Report TIK-Report 103, Swiss Federal Institute of Technology Zurich (ETH), 2001.
[19] Brandimarte, P. Routing and scheduling in a flexible job shop by tabu search. Annals of Operations Research, Vol.41, No.3, pp.157–183, 1993.
[20] http://people.idsia.ch/~monaldo/fjsp.html. Last Visited on 10 December. 2020.